Name | Type a name for the impact analysis or
check the AutoName check box. |
Description | Type a description for the impact
analysis. |
Severity | From the list, select the level of severity for the analysis. Typical values are Low, Medium, and High. |
Quality Impact | How the quality of the product
will be affected by the engineering change. |
Lifecycle Cost Issues | Any issues about lifecycle
costs. |
Prioritization Benefit | A number indicating
the priority of the perceived benefit. |
Relative Cost | The relative cost to be incurred,
rated on a scale of 9 (highest) to 1. |
Relative Penalty | The relative penalty, rated
on a scale of 9 (highest) to 1. |
Relative Risk | The relative risk involved,
rated on a scale of 9 (highest) to 1. |
Impact Analysis Effort | The number of days
to determine what the impact will be on products and schedules. |
Estimate Schedule Impact | The estimated number
of days to be added to the schedule due to the engineering change. |
Implementation Effort | The number of days to
resolve the engineering change (development + analysis). |
Validation Effort | The number of days to validate
the engineering change. |