Name | Enter the name of the part. |
Policy | Select the policy type from the drop down option. |
Description | Enter the description of the part. |
Owner | By default, the owner is set as the person who is creating the part. To assign a different owner, click or type in the name and select the owner from the available matching options in the box. |
Vault | If you want to use a vault other than the default, click to specify where the part object will be stored in the database. This field is displayed only if more than one vault is available to the context user. |
Spare Part | Select if you want to create a spare part from the drop down option. |
Material Category | Select the material category for the part from the drop down options. |
Weight | Enter the weight of the part. |
Target Cost | Type the target cost on a per part basis.
|
Unit of Measure | Select a Unit of Measure from the drop-down list: LB(pound), IN(inch), GA(gallon), FT(feet), EA(each). |
Lead Time | Select the number of weeks that it will take to manufacture the
part.
|
Effectivity Date | Click and select a target date for the part to become effective in the Bill of Material. |
Estimated Cost | Type the estimated cost on a per part basis. |