From the
Tools section of the action bar, click
B.I. Essentials
.
The
B.I.
Essentials
list appears.
-
Click System Update Status in the list.
The yellow status on some systems indicates that they are impacted by one or
more objects that have been unloaded, deleted, or modified. This leads to inconsistent
links.
For more information, see Using B.I Essentials in Fastener Planning.
-
From the Authoring section of the action bar,
click
Manage Inconsistent Links Operation - Operation
.
-
Select a system.
The
Manage Inconsistent Links Operation - Operation panel
is displayed showing all the inconsistent links found for the selected system and its
children.
The columns in the panel are as
follows:
- Suggestion to Perform: The proposed action to fix the link:
- Evolve Instance-Reroute: If only one candidate
operation for rerouting is found in the session and no configuration mode is
selected for the session.
- Remove Link: By default, if there is no operation in
the same family in the session. The implement link will be deleted.
- Ignore: By default, if there are several operations in
the same family in the session. This can be considered as an error case.
- Delete Operation: Allows deleting the operation
instance.
In this case, "family" means different revisions of the same operation.
- Rerouting Proposal: A candidate operation for rerouting the
link. This may be:
- The operation instance name: If there is only one operation in the same family
in the session
- None: If there is no operation in the same family in
the session
- Ambiguous: If there are several operations in the same
family in the session
- Previous Operation: The operation not loaded in the session
which was previously the target of the inconsistent link.
- Operation: The source operation involved in the
inconsistent link.
Note:
An operation can be deleted only when it is linked to a
single operation.
- Resource: If the operation is referenced by a resource (by another link), this resource is indicated.
Note:
Manage the selected operations with Center Tree
,
Properties
, and
Reframe On. For
more information, see Using the System Editor.
-
Select the Delete Operation lines in the panel and click
Apply.
The operation-operation implement links are deleted. Any operation that is linked to
a single operation is deleted. The panel is updated.
-
Select the Reroute lines in the panel and click
Apply.
If only one operation on same family is in session, the link is rerouted.
If you try to reroute one or more ambiguous cases, a Reroute assistant is launched.
Then you can choose an operation from all candidate operations available in session to
reroute the link.
Then, the link is rerouted, which means that now the operation is assigned to the
operation loaded in session.
The panel is updated.
-
Select the Ignore line in the panel and click
Apply.
Nothing happens: whenever Ignore is selected, implement
links are not taken into account.
-
Proceed as follows to handle the Ignore
Suggestion to Perform:
-
Right-click the Ignore line in the panel and select
Delete.
The Ignore line is replaced by a Delete
Operation line in the panel.
-
Select the Delete Operation line and click
Apply.
The green status of the systems indicates that their update status is good:
all the inconsistent links are resolved.
Note:
If you work under a configuration, the reroute and delete actions occur under this
effectivity mode. For reroute, the operation is evolved. Then it is the valid operation in
the current effectivity that is assigned with the operation loaded in session.