About Navigator

This describes the Navigation sections with commands.

Opening a PPR (Product-Process-Resource) and switching to Live Sim, the Navigator shows the scenario that you have with Credits, Resources, Product Build Up, and General Systems of a Manufacturing Cell. This also includes how many credits you have which you acquire in bundles of 10.

Clicking Create in the Create Worker Task dialog box, is the only command that consumes one credit 10 to 9, from your Evaluation package. The task automatically saves in the database. Using the Edit worker task dialog box, you can then modify your scenario. Clicking Preview updates the manikins position in the modified layout as many times as required, does not use any credits, and does not automatically save. Once acceptable, click Update to save all the new positions in the database and this also does not use any credits.



This displays operations in a sequential order. The operations and systems sort in the EWD Navigator, but not in the tree, by taking into account their sequencing. That is, the Begin Times of the operations.

Move from Worker Task to Worker task in the EWD navigator using the keyboard arrows, Up, and Down. The navigation between worker tasks inside the same subsystem (station) only. If there are no more worker tasks, then the message displays.

The EWD Navigator’s height is all the way down to the limits of the main windows. The three sections constituting the navigator: Resources, and General Systems is of a dynamic size. At an opening, each of the sections expand until the second level of depth.

Note: When all expanded, each section takes 1/3 of the navigator height size, when one collapse the others take the available space. Each section has their own scroll bar when the content displayed is higher than the height section. There is also a navigator minimal width.