Running a Subroutine

You can run subroutines that you have created.


Before you begin: Select a machine, a manufacturing program or a machining operation in the Activities Process Tree.
  1. In the Run Subroutine dialog box that appears, select a Subroutine from the list.
  2. If required, specify the input parameters of the subroutine.

The subroutine appears in the Activities Process Tree and can now be simulated on its own, with a manufacturing program, or with a part operation.