Default Procedures
The following list is the default list of the procedures available when using Manufacturing Context Builder.
You can manage the display of these default procedures with the Display Default Procedures in .
[F1] FASTENER: Load Fasteners and Fasten EBOM Items from EBOM Items
Explores the root EBOM with the required configuration filters.
Explores and selects EBOM occurrences from which you want to load fasteners and fasten EBOM items.
[I1] ITEM: Create/Update MBOM Items from Their EBOM Definition
Explores the root EBOM and MBOM with the required configuration filters.
Explores and selects one or more EBOM occurrences.
[I2] ITEM: Create/Update MBOM Items from Their MBOM Definition
Explores the root EBOM and MBOM with the required configuration filters.
Explores and selects one or more MBOM occurrences.
[I3] ITEM: Load MBOM Items from Volume Filter
Explores the root EBOM and MBOM with the required configuration filters.
Adds a volume section to the EBOM root filter. Selects the EBOM root.
[I4] ITEM: Load MBOM Items Installed by the Selected Install and Predecessor but Closer Than 500 mm
Explores the root EBOM and MBOM with the required configuration filters.
Explores and selects one MBOM occurrences installing less than 100 items.
[I5] ITEM: Load Small Assembly or Install
Explores the root EBOM and MBOM with the required configuration filters.
Explores and selects the MBOM items installing less than 100 items.
[S1] SYSTEM: Load Resources and MBOM Items Operated by a Line Subsystem
Explores the root EBOM, MBOM, System, and Resource (Resources implementing Systems).
Explores and selects one Line Subsystem.
[W1] WORKPLAN: Create a Workplan to Produce an MBOM Item
Explores the root EBOM and MBOM with the required configuration filters.
Explores and selects one MBOM item.
[W2] WORKPLAN: Edit a Workplan to Assign MBOM Items to Operations
Explores the root EBOM and MBOM with the required configuration filters.
Explores and selects one Workplan.
[W3] WORKPLAN: Edit a Workplan to Add or Update Its Work Instructions and Resources
Explores the root EBOM and MBOM with the required configuration filters.
Explores and selects one Workplan.
[W4] WORKPLAN: Edit a Workplan Producing a Small Assembly or Install
Explores the root EBOM and MBOM with the required configuration filters.
Explores and selects one Workplan mounting less than 100 items.
[W5] WORKPLAN: Load MBOM Installed by the Selected Workplan and Predecessor but Closer Than 500 mm and All Associated Resources
Explores the root EBOM and MBOM with the required configuration filters.
Explores and selects one Workplan linked to an MBOM item installing less than 100 items.
[R1] RESOURCES: Retrieve Resources Linked to the Selected Workplan Entities
Explores and selects a Workplan, or any of its children.