Displaying Production Status

You can specify the current time to see processing operations and production status.

  1. From the Auxiliary Viewer toolbar, click 4D Planning .
    4D Planning panel appears.

  2. Drag the slider bar to change current time.
    Operations specified are to proceed on the current specified time are display in the list.

  3. Select a System or an Operation that has Product Flow or Precedence Link.

    This enables Previous if there is previous System or Operation. Next enables if there is next System or Operation.

  4. Click Previous or Next.
    Current time changes to the start time of the previous/next object and the list and Auxiliary Viewer updates accordingly.

  5. Open Preferences on the 4D Planning panel and verify on the Display resources for each Operation option.