Item to System Assignments

You can drag unassigned MBOM items from the tree, or directly from the Auxiliary Viewer and drop to a system tile in the work area.

Click Play to watch the video:

  1. In the tree, select one or more unassigned items and drag them to a target system.
    Creates a new general operation with an implement link between item and operation.
  2. In the Auxiliary Viewer action bar, select Global mode and change the display mode to Show Only Unassigned MBOM .
  3. Create a new system under the root system.
  4. Select and drag unassigned parts in the Auxiliary Viewer and drop them to the new system tile.
    Assigns the MBOM corresponding to the selected parts to the new operation.