User Interface: Operations Details Tabs

The tabs in the Operation Details panel enable you to modify operations details.

Work Instructions
Click the Work Instructions tab to view the following items, ordered as designed:
  • Text Instructions - Rich-text instructions assigned to the current operation.
  • Data Collects - Data collects assigned to the current operation.
  • Signoffs - Signoffs assigned to the current operation.
  • Alerts - Alerts assigned to the current operation.
Parts
Click the Parts tab to view a list of parts assigned to the current operation. Parts assigned to operations will not appear when there is not a scope link in Process Planning from the parent system of the operation to the associated manufactured item. Click a part to highlight that part on the 3D model. When using Apriso integration, highlighting will be disabled for parts that have multiple occurrences with identical instance paths. Multi-selection can be enabled by clicking Multiple Selection on the action bar or by holding the Ctrl key.
Tools or Capable Resources
This tab displays either linked tool equipment (Tools) or capable resources assigned to the current operation. Select a tool or capable resource to highlight it on the 3D model. (If a tool or capable resource can not be selected, it is not available for cross-highlighting in the 3D model.) Multi-selection can be enabled by clicking Multiple Selection on the action bar or by holding the Ctrl key.
Documents
Click the Documents tab to view a list of documents assigned to the current operation. Click a document to load that document in a new window . Your browser popup-blocker should be disabled to open attached documents. 3DWorkbook does not support VPM documents.