Draft
A CO starts in the Draft state when it is created. The CO owner with a Configuration Engineer license can define and edit applicability in this state. These requirements must be met before you can promote a fast track CO from the Draft state:
- A change action (CA) is attached. The CA does not require an attached proposed change.
- A parent CO can be promoted to In Work if none of its child COs are in the Canceled state.
- Technical Assignees must be assigned to all CAs.