You use a change action (CA) to manage an implementation of a change-required
object. Contributors, Authors, and Leaders can create change actions in their
collaboration space. When proposed changes are added to a change order, the system generates and
assigns one or more CAs based on the object's type, policy, and responsible
organization.
There are two ways to manage changes with a change action. The first method
is to add objects to a CA that need to be changed as proposed changes. When objects are
added as proposed changes, the default operation and activity are automatically set
based on maturity and whether the object is configured or not.
The second method is to use 'work under', in which you make changes directly by
working under the selected change action. Using this method, proposed changes are
optional. When you make change using work under, the changes are automatically logged as
realized changes. The details of Work Under in 3DSpace,
3DDashboard, and the Native app can be found in the corresponding Work Under section.