About the Display of Implement Links

If implement links exist between the Logical and the Physical, the information is stored under the Implement Relations node. You can display this connectivity in the tree through highlights. When you select an implement relation under this node, the related physical and logical components are also highlighted in the tree.

This page discusses:

Display of implement links between the Logical root and the Physical root

In the example below, when you select Root Link under Implement Relations, the related Logical and Physical roots are highlighted.



Display of implement links between the Logical Sub-System and the Electrical Physical System

When you select Physical System Link, the Logical Sub System and the Electrical Physical System are highlighted.



Display of implement links between the Logical and Physical Equipment

When you select Equipement 1 Link, Equipment Log 1 and Equipment Phy 1 are highlighted.



Check of the name of the Logical Connector Ports and the Physical Cavities

You should assign the same name for the Logical Connector Ports and the Physical Cavities so as to be able to route the cable between the two cavities.

You can check the cavities' naming in the tree: