An EC part can follow either the development phase or production
phase lifecycle. The development phase lifecycle provides engineers with an
environment in which to design and review part BOMs. In this environment, the
BOM can be tracked and controlled but a change order is not required. The
production phase environment is intended for releasing parts into production
using assigned routes and specified change management. A change order is
required. For more information, see these topics: