| Revision Status | This field appears with a colored box
						  if a newer version of the part exists; otherwise, this field is hidden. | 
 
					  
						| Title | Type the product name value that
							 corresponds to the CATIA name | 
 
					  
						| Design
							 Collaboration | Select whether this part will be
							 synchronized to CATIA or the Native app. | 
 
					  
						| Design
							 Controlled | True. The control of the part is
							 with 
							 ENOVIA
							 
							 Product Finder
							 or design 
							 apps.
							 
						   False. The control of the part is
							 with 
							 Engineering BOM Management.
							 
						   Note:
    		When a part has no related physical reference, this field is empty.  | 
 
					  
						| Change Required | Indicates whether the part is under
						  change management. Change management is required for Production phase parts but
						  is optional for parts in Development phase. For duplicate parts, this option is
						  available only if the part on which the clone is based is in the Development
						  release phase. | 
 
					  
						| Phase | Indicates whether the part is in
						  Development or in
						  Production. This field cannot be edited. | 
 
					  
						| Collaborative Policy | The policy for the part (cannot be
						  edited). | 
 
					  
						| Part Family | Click  to select the name of the part family to which the
						  part is to belong. | 
 
					  
						| Description | Type details about the part. | 
 
					  
						| Owner | By default, the responsible person is
						  set as the person who is creating the part. To assign responsibility to a
						  different person, click  . See 
						  Predefined Queries
						  for details. | 
 
					  
						| Organization |  The Organization on the Part is always based on the
							 login credentials. It represents the organization who owns the design
							 responsibility of the Part. 
						   a. Click 
							  > 
							 My Credentials. b. Change the Organization. 
						   c. Click 
							 OK. 
						   d. Click 
							  on this field. This is restricted to the organization to which you
							 belong. 
						   | 
 
					  
						| Collaborative
							 Space | The list of collaborative spaces that
						  you have access to. A collaborative space is a workspace that contains objects
						  related to a People and Organization project. For example, within the context
						  of a specific project, you could have one collaborative space for Marketing and
						  another for Engineering. | 
 
					  
						| Classification
							 Path | Shown when 
						  IP Classification
						  is installed, the complete taxonomy path, starting from the library, of the
						  classified item. An example is: GLIB >GC where GLIB is the library and GC is the
							 classification of the item. 
						   | 
 
					  
						| Work Under
							 Change | The assigned work under change action (CA) for the part. Select a work
										under CA as required. The work under CA is required if
										change-required is enabled; otherwise, the work under CA is
										optional. If the part is not change-required, it becomes
										change-required when you select a work under CA or group. If
										a work under CA has already been selected and is in the In Work state, this field is
										disabled for editing. This field is not visible in View
											mode. Note:
    		If the Change Required field
											displays the name of a CA group, the CA that you select
											for a Work Under change must belong to that
											group.See Work Under. | 
 
					  
						| Engineering | 
 
					  
						| Unit of Measure | Unit of Measure such as LB(pound), IN(inch), GA(gallon), FT(feet),
										Proportion, and type: weight, EA (each). 
											 Note:
    		 EA (each) must be a positive whole number.  | 
 
					  
						| Estimated Weight | Type the weight of the part and select
						  a unit of measure for the weight from the list. | 
 
					  
						| Target Release
							 Date | Click  and select a target date for the part to become 
						  effective in the 
						  bill of materials. For details on using the
						  calendar, The actual effective date is determined by the release
							 date of the change object that releases the bill of materials in which the part
							 is used. 
						   | 
 
					  
						| Supply Chain/Production | 
 
					  
						| Estimated Cost | Type the estimated cost of the part on
						  a per part basis and select the currency. | 
 
					  
						| Target Cost | Type the target cost on a per part
						  basis. Select the currency from the list. | 
 
					  
						| Lead Time | Click the arrow to select the 
						  lead time to indicate the estimated time that it
						  will take to obtain or manufacture the part. Lead time can range from 1 to 12
						  weeks. | 
 
					  
						| Spare Part | Select Yes or No to indicate if the
						  intended use for the part is as a spare for the principle part used in the
						  assembly. | 
 
					  
						| Procurement
							 Intent | Select "Make" if the part is to be made
						  in-house. Otherwise, select "Buy". If 
						  Manufacturing BOM Management
						  is installed, this field is editable for all revisions for a development phase
						  part. Once a part has been released, this attribute cannot be edited on any
						  future revisions of the part, regardless of state. To change the Procurement
						  Intent, you must create another part. | 
								
									| Classification | 
								
									| Assigned Product | For manufacturing, the product to which
										the part is assigned. | 
 
					  
						| End Item | Value is No for manufacturing parts. This is
										shown only when Manufacturing BOM Management is installed. Once
											the End Item value is
											specified as Yes and the part is released, this cannot
											be set to No for subsequent releases.  | 
								
									| Part Marking | Shows only if Unit BOM Management is installed and
										contains a link to the part marking object if one is
										connected. |