Revision Status
|
This field appears with a colored box
if a newer version of the part exists; otherwise, this field is hidden.
|
Title
|
Type the product name value that
corresponds to the CATIA name
|
Design
Collaboration
|
Select whether this part will be
synchronized to CATIA or the Native app.
|
Design
Controlled
|
True. The control of the part is
with
ENOVIA
Product Finder
or design
apps.
False. The control of the part is
with
Engineering BOM Management.
Note:
When a part has no related physical reference, this field is empty.
|
Change Required
|
Indicates whether the part is under
change management. Change management is required for Production phase parts but
is optional for parts in Development phase. For duplicate parts, this option is
available only if the part on which the clone is based is in the Development
release phase.
|
Phase
|
Indicates whether the part is in
Development or in
Production. This field cannot be edited.
|
Collaborative Policy
|
The policy for the part (cannot be
edited).
|
Part Family
|
Click
to select the name of the part family to which the
part is to belong.
|
Description
|
Type details about the part.
|
Owner
|
By default, the responsible person is
set as the person who is creating the part. To assign responsibility to a
different person, click
. See
Predefined Queries
for details.
|
Organization
|
The Organization on the Part is always based on the
login credentials. It represents the organization who owns the design
responsibility of the Part.
a. Click
>
My Credentials.
b. Change the Organization.
c. Click
OK.
d. Click
on this field.
This is restricted to the organization to which you
belong.
|
Collaborative
Space
|
The list of collaborative spaces that
you have access to. A collaborative space is a workspace that contains objects
related to a People and Organization project. For example, within the context
of a specific project, you could have one collaborative space for Marketing and
another for Engineering.
|
Classification
Path
|
Shown when
IP Classification
is installed, the complete taxonomy path, starting from the library, of the
classified item. An example is:
GLIB >GC where GLIB is the library and GC is the
classification of the item.
|
Work Under
Change
|
The assigned work under change action (CA) for the part. Select a work
under CA as required. The work under CA is required if
change-required is enabled; otherwise, the work under CA is
optional. If the part is not change-required, it becomes
change-required when you select a work under CA or group. If
a work under CA has already been selected and is in the In Work state, this field is
disabled for editing. This field is not visible in View
mode. Note:
If the Change Required field
displays the name of a CA group, the CA that you select
for a Work Under change must belong to that
group.
See Work Under. |
Engineering
|
Unit of Measure
|
Unit of Measure such as LB(pound), IN(inch), GA(gallon), FT(feet),
Proportion, and type: weight, EA (each).
Note:
EA (each) must be a positive whole number.
|
Estimated Weight
|
Type the weight of the part and select
a unit of measure for the weight from the list.
|
Target Release
Date
|
Click
and select a target date for the part to become
effective in the
bill of materials. For details on using the
calendar,
The actual effective date is determined by the release
date of the change object that releases the bill of materials in which the part
is used.
|
Supply Chain/Production
|
Estimated Cost
|
Type the estimated cost of the part on
a per part basis and select the currency.
|
Target Cost
|
Type the target cost on a per part
basis. Select the currency from the list.
|
Lead Time
|
Click the arrow to select the
lead time to indicate the estimated time that it
will take to obtain or manufacture the part. Lead time can range from 1 to 12
weeks.
|
Spare Part
|
Select Yes or No to indicate if the
intended use for the part is as a spare for the principle part used in the
assembly.
|
Procurement
Intent
|
Select "Make" if the part is to be made
in-house. Otherwise, select "Buy". If
Manufacturing BOM Management
is installed, this field is editable for all revisions for a development phase
part. Once a part has been released, this attribute cannot be edited on any
future revisions of the part, regardless of state. To change the Procurement
Intent, you must create another part.
|
Classification |
Assigned Product
|
For manufacturing, the product to which
the part is assigned. |
End Item
|
Value is No for manufacturing parts. This is
shown only when Manufacturing BOM Management is installed. Once
the End Item value is
specified as Yes and the part is released, this cannot
be set to No for subsequent releases.
|
Part Marking
|
Shows only if Unit BOM Management is installed and
contains a link to the part marking object if one is
connected. |