Merging and Moving Proposed Changes Items

You can move proposed changes from one CA to another existing or a new CA. This is useful for splitting proposed changes into different CAs. CAs can also be moved from one CR/CO to another CR/CO. Proposed changes across different CAs (of the same CR/CO) can be merged into one CA. CAs should have the same RTOs.

Required Access Roles:

  • Baseline: Leader, Author
  • App-specific: Design Engineer, Senior Design Engineer, Manufacturing Engineer, or Senior Manufacturing Engineer.


Before you begin: One or more proposed changes must be assigned to a CA.
  1. In the change order, select Content in the main menu.
  2. Select the Proposed Changes tab.
  3. In the Move to menu, select either Existing Change Order, New Change Order, Existing Change Action, or New Change Action.
  4. Select either a change order or change action to which to move the proposed change(s).
  5. Select the proposed changes to move.