| Part Name
|
Type a unique identifier for the part,
such as "Part B-01". This is the name that will appear in
all tables that list manufacturer equivalent parts. |
| Title
|
The common identifier for the part, such
as "small inner bracket bolt". |
| Manufacturer
|
Click to select the manufacturer of the equivalent part. The
search page opens where you can search for and select a
manufacturer that is defined as a supplier for the host
company. Only one manufacturer can be assigned for any MEP. |
| Manufacturer
Location
|
Click to select the location. The Search Location page opens
where you can search for and select a location that is
defined as a manufacturing site for the host company.
|
| Usage
Location
|
| Name
|
Click to select the location of the company that will have
allocation responsibility for
the MEP. Allocation responsibility indicates that a location
has been designated or is authorized (depending on the
location lifecycle state) to allocate / inventory a given
MEP in support of the production process. |
| Location Status
|
Select a status from the list to indicate
whether the location has been approved to allocate the part
in support of production: Required, Authorized, or Not
Authorized. |
| Location Preference
|
Select whether the location is Preferred
or Not Preferred. |
| Type
|
Select the type of part you want to create. Click if you are creating a subtype. Click the plus sign(s) to
select a subtype from the type hierarchy in the form and
click Select. Note:
When you select a Raw
Material, design collaboration is turned off and
disabled.
|
| Revision
|
Shows the revision identifier, which is
automatically generated using the internal ID of the
Manufacturer followed by a dash and then the internal ID of
the Manufacturer Location. On premises only: You can
edit this field only if your Business Administrator has
allowed custom revisions for MEPs.
|
| Description
|
Enter details that describe the part.
|
| Unit of Measure
|
Unit of measure Type (Weight, Volume,
etc.) and Unit of measure (KG, CM^3, etc.) This is an
engineering attribute. |
| Collaborative
Policy
|
The policy is Manufacturer Equivalent
Part. To change the policy, click the arrow. This is
displayed only if more than one policy is available.
|
| Attributes
|
| Weight
|
Enter the weight of the part and select a
unit of measure for the weight from the list. |
| Target Cost
|
Enter the target cost on a per part basis.
|
| Estimated Cost
|
Enter the estimated cost on a per part
basis. |
| Lead Time
|
Select the number of weeks that will be
required to manufacture the part. |
| Procurement Intent
|
How the MEP is to be acquired. Select
either "Make" or "Buy". |
| Extended
Attributes
|
| Spare Part
|
Select Yes or No to specify whether the
part is to be used as a spare. |
| Target Release Date
|
Click and select a target date for the part to become effective in the bill of materials. Note:
The actual effective date is determined by
the release date of the CA which releases the bill of
materials the part is used in.
|