The initial state of resources under a V5 process Resource List are stored in V6 in a single (atomic)
simulation state, assigned to the root resource under the
PPRContext. Also, a composite simulation state is created, set as
active and assigned to the root resource under the PPRContext. This
composite simulation state points to the atomic state created
for the root product and the atomic state created for the root
resource.
To validate this, select the root resource in the
PPRContext in V6, enter the 3D Simulation environment (so the
root resource is set as the ASO). Then click the Simulation
States panel. The atomic state and a composite
state (of the state of the products and the states of resources) are present with the
composite state set as active.
This active simulation state is applied only when you run
a simulation at the root resource level (root resource is the ASO).
To run imported robot tasks and use the imported simulation state,
display all level tasks in the Behavior panel,
select the desired task, and simulate it.
|