You can identify and update manufacturing scenarios that are out-of-date. The updates
apply to the scenario and their Tracks.
Important:
This functionality is only available for Tracks created or edited since
3DEXPERIENCE
R2020x and included in a manufacturing scenario. Otherwise, you can manually edit a Track and
update its result, then update the swept volume.
Open a session containing a manufacturing scenario of the moving object.
From the Verification section of the action bar,
click Manufacturing Scenario Update Management
.
A panel appears, listing the status of the manufacturing scenarios and their
Tracks according to the Manufacturing Scenario Status B.I.:
Out-of-date
Up-to-date
Tip:
Click to open the B.I. Essentials panel with
the Manufacturing Scenario Status B.I.
This B.I. is only
available through the Manufacturing Scenario Update Management
command. It is not available through the Tools > B.I. Essentials command.
From the panel, right-click the out-of-date scenario, then click Update
Manufacturing Scenarios and Tracks
.