You can reroute FMEAs associated
with a system to be analyzed, when the system is revised.
Recommendation:
To keep an analysis on the original revision,
you can create a branch for the original FMEA, and then move this branch on the revised system.
Before you begin:
Associate an FMEA with a system.
Create a revision of the system from Collaborative Lifecycle.
To access Collaborative Lifecycle, the Collaborative Innovator role is required.