        From the Pit Optimization section of the action bar,
          click New Processing
           . Alternatively, in the tree, double-click Processing in the Pit Opt case
          underneath the Scenario category, and select New
            Processing.
        Underneath the Pit Opt case scenario instance, double-click the processing
          node, and select New processing from the context menu.
        
      
        In the New processing  dialog box, enter a descriptive
            Name
      
        From the Rock Type Attribute  list, select the required ore, and
            click Add Path.  You can add as many paths as required.
        Selecting the rock type attribute determines which codes or technical regions
          can be selected in each path of the  Rock Type  that is considered.
        
        Select the code from the Rock Type list. Only codes related to
          the  Rock Type Attribute  you selected, are available.
      
        Enter a value for the Processing Cost.
        The  associated values required  for  Commodity,
            Cost, Recovery percentage, Min
            Grade  and Max Grade  are provided in the table for
          each path. 
        Click Ok.
      
 |