Double-click the label of the required results to switch the context to the current
result.
If the required results are not the active results, right-click the label of the
required results, then select Set as Current.
-
Review the Summary. The summary provides a summary of the
optimization, without needing to run another volume calculation.
-
Double-click Summary.
-
Review the results. The results displayed include the number of phases, the
undiscounted value, the total mass, the total ore mass, the total waste mass, the
strip ratio, the number of periods, and the discounted value.
-
Click Cancel to close the summary.
-
Review the Phase report. The phase report shows the results of
the optimization run including, the in place value, tonnage, and grade aggregated by the
phase and ore classification.
-
Double-click Phase report.
-
The Phase report dialog box appears. The Table
Report that includes the in place value, tonnage, and grade aggregated
by the phase and ore classification is available. The Chart
Report contains a stacked bar chart showing the phase on the X axis and
the tonnage on the Y axis.
-
To export the bench report results, click Export to
CSV.
-
Click Cancel to close the report.
-
Review the Period report. The period report contains a summary
of the scheduling results. The period report is only available when scheduling run
successfully.
-
Double-click Period report.
-
The Period report dialog box appears. The Table
Report that includes the discounted value and undiscounted value, as
well as, the tonnage and grade aggregated by period and destination is available. The
Chart Report contains a stacked bar chart showing the period
on the X axis and the tonnage on the Y axis.
-
To export the bench report results, click Export to
CSV.
-
Click Cancel to close the report.
-
Review the Period and Phase report. The period and phase report
contains a summary of the relations between the period and the phase. The period and phase
report is only available when scheduling run successfully.
-
Double-click Period and Phase report.
-
The Period and Phase report dialog box appears. The
Table Report that includes the discounted value and
undiscounted value, as well as, the tonnage and grade aggregated by period and phase
is available. The Chart Report contains a stacked bar chart
showing the period on the X axis and the tonnage on the Y axis.
-
To export the bench report results, click Export to
CSV.
-
Click Cancel to close the report.
-
Review the Bench report. The bench report contains a summary of
the scheduling of phase benches. The bench report is only available when scheduling runs
successfully.
-
Double-click Bench report.
-
The Bench report dialog box appears. The panel displays a
table report that includes the discounted value and undiscounted value, as well as,
the tonnage and grade aggregated by period, phase, bench, and destination.
-
To export the bench report results, click Export to
CSV.
-
Click Cancel to close the report.
|