Preliminary
A supported object is created in the Preliminary state. The owner performs
whatever CAD work is necessary to generate the new file(s), then checks
them into the object and promotes it to the Review state and the following
checks are fired:
- The object must be connected to an ECO via the ECO New Drawing Revision
relationship.
- All earlier revisions of this object must be at the Release state.
If these checks pass, the object will be promoted to the next state.
Review
The object is reviewed and approved by the Design Reviewer who approves
it (or rejects it, if needed).
Approved
After the object enters the Approved state, all proposed changes connected
to its ECO are checked to see if they are also in the Approved state.
If all proposed changes are in the Approved state, the ECO is automatically
promoted to the Review state. If any single proposed change connected to
the ECO is in a state prior to Approved, the ECO is not promoted to the
Review state.
Release
As the object enters the Release state, an Action fires that disconnects
all Part Specification relationships between the previous revision of
this object and its parts, then connects identical Drawing Specification
relationships between those same parts and this object. This process
has the same effect as if float were defined on the TO end of the Part
Specification relationship.
In the Release state no disconnections of any relationships are allowed.
Connections are however permitted to ECR objects that want to revise
the object.
|