Common Components Comparison Report

This comparison report shows only those objects that have the same information for both snapshots, in other words, objects that have not changed.

To access this report, click the Common Components Report tab after applying snapshot comparison criteria.

This topic describes:

The left-hand side shows information for the snapshot you selected on the Snapshots tab. The right-hand side shows information for the snapshot you selected in the Compare Criteria tab. You can move the slider to the left or right to reveal more fields on either side.

Columns

Column NameDescription
LevelIdentifies the level of information.
NameThe name of the object.
TypeThe type of object. The root level is Snapshot which can contain child elements such as Product, Hazard, and Requirement.
StateThe lifecycle state of the object.
TitleThe title of the object.
IdentificationWhether the hazard is "Known" or "Foreseeable."
ConditionWhether the hazard is possible in a "Normal" or "Fault" condition.
Classification MajorThe major classification of the hazard.
Classification MinorThe minor classification of the hazard.
Sequence of EventsThe sequence of events for hazardous situations.
Hazardous SituationCircumstances in which people, property or environment are exposed to hazards.
HarmIdentifies physical injury or damage to people, damage to property or environment.
Current SevThe current severity level. Values are 1 through 5.
Current OccThe current occurrence level. Values are 1 through 5.
Current RPNThe current Risk Priority Number for the hazard. The system calculates the RPN value by multiplying the probability value by the impact value. The probability and impact values can both range from 1 to 5, 1 being the lowest and 5 the highest. Therefore, the RPN can range from 1 (1x1) to 25 (5x5).
Original SevThe original severity level. Values are 1 through 5.
Original OccThe original occurrence level. Values are 1 through 5.
Original RPNThe original Risk Priority Number for the hazard.
Residual Risk AcceptableWhether the residual risk is acceptable.
Benefit Exceeds RiskWhether the benefit exceeds the risk.
Residual Risk DisclosureWhether to disclose the residual risk.
OwnerThe owner of the object.