Design Project Snapshot Comparison

You can compare the structure of two design project snapshots.

When only one snapshot is selected, the comparison is performed between the selected snapshot and the current state of the Design Project.

For a design project, in the Snapshots tab, select two snapshots and click Compare Schedule . The comparison is displayed in the Structure tab.

Field Name Description
Name The name of the snapshot or task.
Type The type of object.
IdThe object ID.
DependencyThe task dependency.
Constraint TypeThe type of constraint for this task, which specifies when the task should be completed within the project.
Constraint DateConstraint Types other than "As Soon as Possible" or "As Late as Possible" have a constraint date.
Estimated DurationThe duration estimate for the snapshot or task, which is expressed in days or hours.
Estimated Start DateThe start date of the estimated duration.
Estimated End DateThe end date of the estimated duration.
Actual DurationThe actual duration for the snapshot or task, which is expressed in days or hours.
Actual Start DateThe start date of the actual duration.
EstimActualated End DateThe end date of the actual duration.
DescriptionThe description of the object.