** BOM Attributes section |
F/N | The find number is an ID that is used on drawings as “bubble” callouts. Find numbers must be unique at any given level in the BOM. They are usually integer values: 1, 2, 3… |
Ref Des | Reference designator of the MBOM connection. The reference designator ID is used on printed circuit cards to indicate the location an electronic component is to be inserted. Reference designators are usually values like R1, R2, R7 or C1, C5 (R for resistor and C for capacitor) |
Quantity | Quantity of the part included in the MBOM assembly |
Seq | The connection's sequence for the given EBOM Uniqueness Identifier (EUI) |
Start Date | MCO start date, based on the plant time zone |
End Date | MCO end date, based on the plant time zone |
MCO-In | The MCO that effects in the MBOM connection |
Remove | The MCO that effects out the MBOM connection |
Manufacturing Usage Code | The manufacturing-specific identifier that can be used to distinguish the placement or location of a part in the context of a manufacturing process |
Manufacturing Usage Description | The manufacturing usage description included on the MBOM relationship |
Status | The status of the MBOM relationship. Possible values are Current, Pending, History |
** Part Revisions section |
Name | Parent part name |
Type | The part type or subtype |
Policy | The policy that governs the lifecycle and access permissions of the part |
Description | Description of the parent part |
Revision | Filtered parent part revisions. Click any highlighted link in this column to view the Properties page for that part revision. |
Make-Buy | Make / Buy code for each part revision for the given plant. Displayed in same sequence as part revisions |
Start Date | Start date for each part revision for the given plant, based on the plant time zone. Displayed in same sequence as part revisions |
End Date | End date for each part revision for the given plant, based on the plant time zone. Displayed in same sequence as part revisions |
Status | Status (Current/ Pending/ History) for each part revision for the given plant |