Resource and Operation Assignments

Assign Detailing Tasks to a Resource

You can manage "detailing task to resource" assignments using the Assignment Manager command. For example, you can link a robotic task to a robot resource.

  1. Click Assignment Manager .
  2. Select a resource in the tree.
    The Assignment Manager panel appears, showing the current operation assignments of the selected resource.
  3. In the Assigned Operations list, select the line corresponding to the operation.
  4. Click the corresponding cell in the Assign/Unassign Detailing column.
    If detailing tasks are related to the resource, they are available for selection in a list.
  5. Select the detailing task.
    The selected detailing task is linked to the resource.