When you assign an operation clicked from the tab, it creates a new working resource with an implement link to the operation at the targeted position. The previously existing working resource remains in the MBOM structure but its implement link to the product is removed. In the example above, if the "Assemble operation" is selected, it will be executed by Georges instead of Lennie.