The assigned and assignable resources are listed for the
selected operation.
All
the resources that are listed are derived from the Resource-System
scope definition.
The Assigned
Resources area lists the resources that are already
assigned to the selected operation. In the example above, one
resource is already assigned to the selected operation.
In the
Assignable Resources area:
- the tab lists the working resources that are not assigned.
One or more working resources can be assigned to the
operation.
- the tab lists the nonworking resources that are not assigned.
One or more nonworking resources can be assigned to the
operation.