Manage Resources Structures Command

Create an Assets Structure for a Workplan

To create a preassigned work center link with an operation, you must create a link between the assets structure of the work center and the workplan of the operation.

Note: You can only assign one assets structure to a workplan.

  1. Select a workplan.
  2. From the Authoring section of the action bar, click Manage Resources Structures .
    The Manage Resources Structures panel opens.
  3. Click Create Assets Structure , then select the assets structure from the tree.

The assets structure is now assigned to the workplan.

Tips: You can manage the assets structure links from the Manage Resources Structures panel.
  • Click to delete the link.