- Select a workplan.
- From the Authoring section of the action bar, click Manage Resources Structures .
The Manage Resources Structures panel opens. - Click Create Capable Resources Structure .
An area-type resource linked to the workplan is created.
Notes:
- If you select an object that is not a workplan: the Manage Resources Structures panel is not refreshed.
- If you select a workplan without capable resources structure linked: the Manage Resources Structures panel is refreshed with the selected workplan icon and name. The capable resources structure label is Not defined, and you can assign one by clicking Create Capable Resources Structure .
- If you select a workplan having a capable resources structure loaded in the session: the Manage Resources Structures panel is refreshed with the selected workplan icon and name. The capable resources structure label gives the product structure name and you can no longer manage this link. Both objects are linked definitively.
- If you select a workplan having a capable resource structure but not loaded in the session: the Manage Resources Structures panel indicates that a capable resources structure already exists, and you can load it in the session with all its children. The capable resources structure appears under the PPR tree. The panel is refreshed and the capable resources structure label gives the product structure name. You can no longer manage this link. Both objects are linked definitively.
|