Synchronizing Data with Planning for a Manufactured Product

Synchronize Data with Planning for a Planning System

You can synchronize planned data for a planning system.

  1. Click a system or an organizational resource scoping a system, and from the Authoring section of the action bar, click Synchronizing Data with Planning .
    The Programming Context dialog box appears.
  2. Select Assembly and click OK.
    The Synchronizing data with Planning panel appears.

    The panel includes:

    • Planning System: The selected system that is scoped by the selected resource.
    • Operation Level: The level of depth of listed operations. If the level is 1, then all operations under a system are displayed. If the level is 2, then all operations under a system + their operation children are displayed. If the level is 3, then all operations under a system + their operation children + their operation grand children are displayed, and so on.
    • Select the Location: Sets the organizational resource for the location of the Manufacturing product creation for the selected rows. The command is grayed when no row is selected.
    • Synchronize data with planning for the selected rows: Creates or updates the corresponding Manufacturing product for the selected rows at a specified location. The command is grayed when no row is selected.
    • Operation: The name of an operation occurrence.
    • Manufacturing Product: The name of the generated Manufacturing product, if any.
    • Assigned Resource: The assigned executing resource, if any.
    • Location: The name of the organizational resource owning the manufactured product, parents of the assigned resource, or the resource scoping the selected system, if any.
    • Status: The status of the content of the Manufacturing product. Yellow signifies when no Manufacturing products have been created. Red signifies when the content of the associated Manufacturing product is different from the corresponding planning operation. Green signifies when the content of the associated Manufacturing product does not need to be updated.

  3. Specify the parameters and double-click a row to bring up the panel shown in previous section. Create/ update the manufacturing product for the selected operation and click OK.
    This creates the planned Manufacturing Product as specified in the Synchronizing data with Planning panel for the planning system. The Status in the Synchronizing data with Planning panel will be green to indicate an updated status.