Create a Precedence Link

You can create a precedence link to specify a precedence constraint between two operations in the same system.

  1. From the Authoring section of the action bar, click Create Precedence Link .
  2. Select two operations in the following order:
    1. Select the operation that must be completed first.
    2. Select the operation that must start once the first operation is completed.

The precedence link is created:

  • In the Process Gantt

  • In the System Editor

Tip: If arrows do not appear in the System Editor:
  1. From the Tools section of the action bar, click App Options .
  2. In the App Options panel, select Display Time Constraints , then click Refresh System Editor .