Create a Start-Start Link

You can create a start-start link to specify a synchronized start between two operations in the same system.

  1. From the Authoring section of the action bar, click Create Start-Start Link .
  2. Select two operations that must be launched at the same time.
  3. Optional: Specify a delay. Right-click the arrow to open the context menu and click Constraint Properties .

    Note: To edit the delay, double-click the arrow in the Process Gantt.

The start-start link is created:

  • In the Process Gantt

  • In the System Editor

Tip: If arrows do not appear in the System Editor:
  1. From the Tools section of the action bar, click App Options .
  2. In the App Options panel, select Display Time Constraints , then click Refresh System Editor .