Cycle Time Definitions
This describes the cycle time definitions.
- Leaf System
- System with no child system. In the Process Gantt Chart and Workload Balancing panel, cycle time is displayed only for leaf systems.
- Total Time
- Displayed in the Workload Balancing panel, it is the sum of the operation times in a system.
- Utilization
- Displayed in the Process Gantt Chart, it is the ratio in percentage between the total time of the operations and the system cycle time.
- Idle Time
- Displayed in the Workload Balancing panel, it is the sum of time intervals during a cycle time when the system has no operations.
- Drifting Operation
- In the Workload Balancing panel, an operation exceeding the cycle time when sequenced in a system can have a Multi-Cycle attribute. The drifting operation and following operations in the sequence can shift to other systems, depending on the product flow.