When the initial and target systems do not have a common
parent system, you can re-instantiate all the initial system's pinned and
unpinned operations in the target system.
-
Open a system structure comprising an initial system and a
target system that do not have a common parent system.
-
In the system structure:
-
Right-click operation Op 3 in the initial system, then
select
Pin Operation.
-
Right-click operations T Op 7 and T Op 9 in the target
system, then select
Pin Operation.
A pin symbol appears on these operations to indicate that
they are locked.
-
From the
Authoring section of the
action bar,
click
Automatic Line Balancing
.
The
Automatic Line Balancing dialog box appears.
-
Select the initial system and target system.
- Optional:
To remove all existing operations from the target system before
balancing afresh, select the
Delete balanced operations under target system
option.
Notes:
- This option is useful to bypass unsolvable constraints for
rebalancing.
- This option is ignored if the initial system and target system are
the same.
-
Click
Generate.
Operations T Op 7 and T Op 9 do not move in the target
system. A new operation Op 3 is instantiated in the target system and is not
pinned. The initial system is unchanged because it is in another root system.