Name
|
The name of the resource request.
|
|
Indicates that there are assigned
resources for the request. Hover over the icon to see the names of the assigned
resources.
|
State
|
The state of the resource request. Values can be Draft, In Work, In
Approval, Completed, and Rejected. Only a Project Lead has access to
the Draft and Rejected states. Once a Project Lead submits the
resource request, it advances to the In Work state for further
processing by the Resource Manager. |
Skills
|
The preferred skill of the resource.
|
Resource Pool
|
The resource pool to which the resource
request is made to acquire the resources.
|
Std Cost/Hr
|
The standard cost per hour for this
request.
|
[Timeline]
|
For the FTE filter, the FTE value is calculated based on the following
formula: FTE of a month on the timeline = (number of working days in
that month for that request / total working days in that month) *
requested FTE. For example, for a task with 10 days duration in a 20
day working month, a resource request is created with FTE value 2.
FTE value = (10 / 20) * 2 = 1. The value 1 is displayed in the
corresponding month on the timeline. The costs filter shows the
hours multiplied by the rate. The values in the properties file
determine whether this is in Weekly, Monthly or Quarterly
format. Once entered, this entry should not be
changed. |
Total
|
The total days required for the resource.
|
For each
Resource Person (indicated by
), the page lists these columns:
Name
|
The name of the resource that the Project
Lead has requested.
|
State
|
The state of the resource. Values can be In Work, In Approval,
Completed, and Rejected, depending on the state of the resource
request. However, a resource request in the Draft state has
resources in the In Work state. |
Skill
|
The skill associated with the resource,
which may be different from the skill specified on the resource request.
|
Resource Pool
|
The names of the resource pools that
contain the resources. If the same resource exists in more than one resource
pool, multiple names can be listed.
|
[Timeline]
|
For the FTE filter, the FTE value is calculated based on the following
formula: FTE of a month on the timeline = (number of working days in
that month for that request / total working days in that month) *
requested FTE. For example, for a task with 10 days duration in a 20
day working month, a resource request is created with FTE value 2.
FTE value = (10 / 20) * 2 = 1. The value 1 is displayed in the
corresponding month on the timeline. The costs filter shows the
hours multiplied by the rate. The values in the properties file
determine whether this is in Weekly, Monthly or Quarterly format.
Once entered, this entry should not be changed. |
Total
|
The total days required for the resource.
|