Merging and Breaking Routes with Sheet Connectors

Merging Routes with Sheet Connectors

During the merging process, one of the routables is deleted and the two sheet connectors are paired.


Before you begin: Create two diagram views containing an equipment connected by a route which ends as a sheet connector.
  1. In the tree, click the sheet containing the second diagram view.
  2. Click the off-sheet connector.
    The two routes are merged. The routable from the active diagram view is deleted in the tree. The second routable refers to the route connected to the selected off-sheet symbol. If you have defined a text template on the route, it is updated. On and off sheet management and cross-references resolution are triggered.