If you request an effectivity split, the previous item is kept with a split effectivity. A specific mask is shown in the tree and
an instance of the new revision is added.
-
On the tile or in the tree, select the entity
to replace, then right-click
Replace >
Replace by Revision.
The
Replace Options dialog box appears.
-
If relations point to the entity, select one of the proposed
analysis options:
-
Automatically reconnect: the system tries
to reconnect the relations and you are prompted for input if no automatic
reconnect is possible
-
Browse: you are prompted for input to
reconnect the relations
- No analysis: relations are not
managed.
The Select a Revision dialog box appears.
-
Select the replacing revision and click
OK.
The Define Effectivity dialog box appears.
-
Select the new effectivity and click
OK.
A message box appears proposing a number of effectivity
actions.
-
Choose
Yes to split the effectivity or
No to work without effectivity.
-
In the
Edit Links & Relations dialog box, if you
selected
Automatically reconnect or
Browse, reconnect relations when required.
-
Click
OK.
The item is replaced by the new revision.