Display of Columns in Workload Balancing
This option lets you display columns in the
Workload Balancing panel for operations of any
level.
- Leaf systems
- For a selected system, one column is displayed in the panel for
each leaf system that includes operations.
- Operations
- For a selected operation, one column is displayed in the panel for
each operation that includes operations, according to the level specified in
the
Level from leaf system box.
By default, the
Leaf systems option is selected.
Value Added Display
- Display value added ratio on system
-
Select this option to display a "value added" bar on top of the
system cycle bar. The value added is an attribute that can be set on each
operation of the system. You can specify the color of this bar by selecting one
of the proposed colors. By default, the bar is yellow.
Note:
This option cannot be selected if the
Display value added categories from Time Analysis on
system option is already selected.
By default, the option is not selected.
- Display value added categories from time analysis on system
-
Select this option to display bars for value added categories in the Workload
Balancing bar chart. The value added categories
can be set on the time analysis of an operation. The total value
for each category is computed for all the operations in the
system.
Note:
This option cannot be selected if the
Display value added ratio on system option
is already selected.
By default, the option box is not selected.
Drifting
- Drifting operation
- This option lets you choose a color to display drifting operations
in the
Workload Balancing
panel.
Small Duration
- Color for System/Operation of zero duration
- This option lets you choose a color to display systems and
operations with no duration, defined in the
Workload Balancing and
Resource Balancing panels.
- Scale for System/Operation of zero duration
- This option lets you specify a size for the rectangles that
identify operations with no duration defined, in the
Workload Balancing and
Resource Balancing panels.
By default, the scale is 0.25.
Computation of Requested Resources
- Computation of requested resources
- When the total operation time is superior to the cycle time, this option computes the actual
number of requested resources required to meet the cycle time.
By default, the check box is selected.
Workload Synthesis
This option lets you choose a color for the
Maximum,
Average, and
Minimum system time displayed in the product
configuration synthesis.
Sequence Mode for Workload Balancing
Select the option:
- Precedence / Product flow mode
- When this option is selected, operations are displayed in the
Workload Balancing bar chart based on
precedence
constraints. In case of same precedence, they are displayed based on
product
flows.
- Start time / tree order mode
- When this option is selected, operations in the
Workload Balancing bar chart based on start
time. In case of same start time, they are displayed based on tree order.
This mode supports all types of links between operations.
By default, the
Precedence / Product flow mode option is selected.