-
To define where the operations are executed, select all operations in General systems
A, B, and C, and drag them to
the first-level Manufacturing Cell in the tree.
-
To define who executes the operations, press Shift and drag the
operations in General system A on Worker 1 in the
tree.
-
In the same way, assign the first half of the General system B
operations to Worker 2 and the second half, except the General
operations, to Worker 3.