Introduction
It is possible to have several root systems under the PPR Context.
This allows you to define several work plans (or item plans) for the same item. You can easily compare the different work plans by switching from one to another. You do that by double-clicking a root system.
This changes the active root system, which is framed in blue in the tree.
At a lower level of the tree, it is possible to insert new and existing systems and operations.