*BASELINE CORRECTION

Include baseline correction.

This option is used to modify an acceleration history to minimize the overall drift of the displacement obtained from the time integration of the given acceleration. It must appear immediately after the data lines of the AMPLITUDE option.

This page discusses:

There are no parameters associated with this option.

 

Data lines to define the correction intervals (optional; if no data lines are given, the baseline correction treats the entire time of the amplitude definition as a single correction interval)

First line
  1. Time point defining the end of the first correction interval and the beginning of the second correction interval.

  2. Time point defining the end of the second correction interval and the beginning of the third correction interval.

  3. Etc., up to eight values per line.

Repeat this data line as often as necessary. Each line (except for the last one) must have exactly eight time points.