Working Under Unified Change Control

You can configure an object not created while working under a change action to make it change controlled so that changes made to it are tracked and logged.

Required Access Roles: Leader role, or an equivalent app-specific role, and a license for Configuration Engineer or Change Manager, or the Collaborative Industry Innovator role and assignment as the owner or a contributor to the change action


Before you begin: The object must have been created while not working under a change action so that it is not automatically change controlled. The change action to work under must already exist and be in the In Work state.
See Also
About Working Under a Change Action
  1. Select the object that is not currently under strict change control.
  2. From the Edit tab, click Properties.
  3. Select the Change tab.
  4. Click Change Required to toggle it to active.

    Note: Users with the Leader role can toggle the Change Required field to inactivate unified change control up until the first change is made to the object while working under a change action.

After the object is enabled for unified change control, all future changes made to it are logged in the Realized Changes tab of the change action being worked under when it is first changed. That change action is listed in the Change Required field in the Change tab of the object's properties.