Adding an Activity

You can drop an activity directly on the process diagram.

  1. From the Flow section of the action bar, click Activity and drop it on the process diagram.
  2. If you want to add an adapter within an existing activity, do the following:
    1. Click the arrow in the top right of the blue box to expand the activity.
    2. From the Add section of the action bar, click an adapter icon.
    3. Position the pointer over the activity where you want to add the adapter, and click the mouse button.
    4. Optional: Continue adding adapters.
  3. To add adapters individually:
    1. Select an adapter from the Add section of the action bar.
    2. Position the pointer over the process diagram where you want to add the adapter, and click the mouse button.

      If you have already added adapters and you are adding a flow adapter, the following message appears:

      Drop here to insert over all

      If you drop the process adapter in the specified location, Automation Process Composer encapsulates the existing adapters in the simulation process.

    Automation Process Composer creates an activity with a single step in it that uses this adapter.
  4. Optional: Continue adding activities.