In this procedure, you create a time analysis that is not attached to an operation.
An unattached analysis can add to a catalog, from which it can attach to
operations.
-
In the Time-Motion Study, click .
-
In the resulting Time Analysis dialog box, change the analysis
title and add a description per your site standards, then select a subsystem and click
OK. The analysis saves in a new tab. To define the analysis
criteria, select it and click Edit Time Analysis.
Note:
If you cannot see the analysis in the tab, click F3 to make
it visible.
-
In the resulting Time Analysis Details dialog box, create the
new time analysis as required for use in the catalog. When finished, click
OK.
-
Select the new analysis, in the same tab, and then choose .
This saves the analysis to a system database, where you can access it for the
catalog.
-
Select Search for the new time analysis.
The new time analysis is displayed in the
Search
Window.
You can add the time analysis lines or modify or delete the
existing ones and then save.
-
Select the Time Analysis that is created.
The New dialog box appears.
-
Click Open, Open Advanced.
The created analysis is opened and the Edit Time
Analysis toolbar appears.
-
You can make further changes as required to the analysis. Then click
Close.
The Close Dialog box message appears: Do you want to save the
changes to the following object?. Click Yes to save
the changes.