RGT Support for Scope and Implement Links for Products and Manufactured Items

You can use CATIA RGT Report generator, to navigate on PPR data through DELMIA procedures.

Click Play to watch the video:

The methods to navigate on PPR data.

  • From a System reference, to be able to retrieve the Scoping Resource, or the Scoped Mfg Item references.
  • From a Mfg Item reference, to be able to retrieve the Scoped Product, or the Scoping Systems/Workplan references.
  • From a Mfg Item occurrence, to be able to retrieve the implementing Operation occurrences
  • From a Product reference, to be able to retrieve the Scoped Mfg Item References
  • From a Product occurrence, to be able to retrieve the Implementing Mfg Item occurrences
  • From a Resource reference, to be able to retrieve the Scoped System references
  • From a Resource occurrence, to be able to retrieve the Implemented Operation occurrences