| 
    Previous
        
          For systems These are the systems (if any) that have a product flow directly or indirectly into
            the latest selected system. For general operations This area shows all the general operations (with nonwork instructions children) whose
            start time (as displayed in the Gantt chart) occurs before the start time of the
            selected general operation.
 Parent
        
          For systems and general operationsThis is the system or general operation that is the parent of the active system or
            general operation.
 Active
        
          For systems and general operationsThis is the system or general operation that is the latest active.
 Children
        
          For systems and general operationsThese are the systems or general operations that are the children of the active system
            or general operation.
 Next
        
          For systems These are the systems that are directly or indirectly connected to the selected system
            by means of outgoing product flow.For general operations This area shows all the general operations (with nonwork instructions children) whose
            start time occurs at or after the start time of the latest selected general
            operation. |