Previous
- For systems
- These are the systems (if any) that have a product flow directly or indirectly into
the latest selected system.
- For general operations
- This area shows all the general operations (with nonwork instructions children) whose
start time (as displayed in the Gantt chart) occurs before the start time of the
selected general operation.
Parent
- For systems and general operations
- This is the system or general operation that is the parent of the active system or
general operation.
Active
- For systems and general operations
- This is the system or general operation that is the latest active.
Children
- For systems and general operations
- These are the systems or general operations that are the children of the active system
or general operation.
Next
- For systems
- These are the systems that are directly or indirectly connected to the selected system
by means of outgoing product flow.
- For general operations
- This area shows all the general operations (with nonwork instructions children) whose
start time occurs at or after the start time of the latest selected general
operation.
|