|
Track is not consistent with resource position |
After the operation simulation, the position of the resource
along the track does not match the resource position. |
|
Track is consistent with resource position |
After the operation simulation, the position of the resource
along the track matches the resource position. |
|
Operation is not impacted |
Either there are no fitting tracks under the operation, or none
of the tracks under the operation move resources. |
|
Analysis impossible |
Analysis is impossible because there are several tracks
(fitting, kinematic, or a combination of both) under the operation. |