Environment: On premises only
 Regardless of the side on which you make changes, the other side is
		locked until after the changes are collaborated and both sides contain the
		updates. Only the updated part is locked and not the entire BOM or product
		structure. After the changes are recorded in the change log and both sides are
		updated, either side can take control and you can make further changes as
		required. 
	 
 
	 For parts not under change-required: 
		
 
		
 
		  - You can directly edit the BOM. 
		  
- If design control is set, you can modify structures using 
			 ENOVIA
			 
			 Product Finder.
			 
		  
- If design control is not set, you can directly edit the EBOM using 
			 Engineering BOM Management.
			 
		  
 
		 For parts under change-required: 
		
 
		
 
		  - The authoring lock overrides the design control setting. 
		  
- You can modify parts with either 
			 ENOVIA
			 
			 Product Finder
			 or 
			 Engineering BOM Management,
			 depending on whether the authoring lock shows "EBOM," "Blank," or "Design".