About Multiple Pending Changes

A BOM can have several pending changes. Depending on its effectivity, you may need to release one change before another, that is, the first change is a prerequisite of the second. You can set prerequisites manually, or in some cases, the system will set a change as a prerequisite. For example, the first change is intended for parts 1-50 and the second change is for parts 1-5. The first change must be released before the second change. Multiple pending changes can be created in any of these ways:

  • Removing one or more parts from the BOM.
  • Replacing a part in the BOM with either a new part or an existing part.
  • Editing a part attribute.